Kitchen Remodeling in Austin, TX

Design, permitting and construction under one contract, with a schedule built around what Austin review actually takes rather than what we wish it took.

The Austin remodeler that plans around the permit instead of pretending it isn't there

Austin has the slowest residential review of any major Texas city. Every contractor knows it and most still quote schedules as if it were Round Rock. We would rather give you a date built on the real review timeline, file early, and hit it, than give you a date you like in March and an apology in July.

Permitting built into the programmeWe know what the City of Austin actually takes and we schedule around it instead of hoping.
Fixed price, written scopeThe number is agreed before demolition. Changes only happen when you ask for one.
Design and build in one contractNo hand-off between the person who drew it and the people who build it. No gap to fall into.
Insured, licensed, documentedLiability cover in force and licensed trades on every electrical, plumbing and mechanical line.
Free in-home consultation

Find out what your project costs before you commit to it

We come out anywhere in Austin or Central Texas, measure properly, and follow up with a fixed price in writing.

Feature kitchen, Austin, TX
$38,000 Typical full kitchen, from
Kitchen remodeling

Kitchen Remodeling in Austin, TX

Cabinetry and stone through to structural changes and additions, run as one contract with the permitting built into the programme rather than bolted on afterwards.

What a kitchen remodel in Austin actually involves

A kitchen is the most complicated room in a house to renovate, plumbing, gas, electrical, ventilation, cabinetry, stone fabrication and flooring all landing in the same space in the right order. Get the sequence wrong and you pay for it twice.

Then there is the Austin layer. If you are changing the footprint you are into impervious cover and possibly the heritage tree ordinance. If you are in Hyde Park or a Local Historic District, exterior changes go to the Historic Landmark Commission. Neither is a problem. Both are a schedule.

The three projects we are asked for most

Austin kitchens cluster tightly:

  • The Allandale wall. A mid-century ranch with the kitchen closed off from the living room. Beam it, reroute what's inside it, rebuild around an island. We run this project constantly.
  • Out of builder grade. Round Rock, Cedar Park and Circle C houses where the layout is already fine and the cabinetry, stone and lighting are not. Predictable, contained, fast.
  • The careful one. A Hyde Park or Travis Heights bungalow where the point is to modernise the kitchen without losing what makes the house worth owning.
Kitchen cabinets & refacing

New custom cabinetry, refacing and refinishing. The biggest line in any kitchen budget.

Kitchen countertops

Quartz, granite, quartzite, marble and porcelain, templated, fabricated and fitted.

Kitchen design & layout

Layout drawings, 3D views and material selections, then the same team builds it.

Luxury kitchen remodeling

Custom inset cabinetry, natural stone, panel-ready appliances and architectural millwork.

Kitchen islands

Adding, enlarging or rebuilding an island, including the plumbing and electrical behind it.

Small kitchen remodeling

Galley and apartment kitchens, layout, storage and light in a room that can't grow.

Outdoor kitchens

Built-in grills, weatherproof cabinetry and stone that survives a Texas summer.

The detail

The honest answer is that the build is the short part. Design, selections and lead times take longer than the construction does, and that's the phase people are surprised by.

PhaseTypical durationWhat's happening
Consultation & measure1 weekSite visit, measurements, budget conversation
Design & selections3 – 6 weeksLayout drawings, 3D views, cabinet and stone selections, final scope
Ordering & lead time4 – 10 weeksCabinetry built, appliances secured, tile and fixtures delivered
Demo & rough-in1 – 2 weeksTear-out, framing, plumbing, electrical, inspections
Install3 – 5 weeksCabinets set, stone templated and fitted, tile, flooring, paint
Finish & walkthrough1 weekAppliances, hardware, punch list, final clean

Custom cabinetry is almost always the long pole. If your timeline is tight, tell us on day one. There are real ways to compress it, and choosing the cabinet line early is the biggest one.

You can stay in the house for a kitchen remodel and most of our clients do. What makes it bearable is preparation rather than optimism:

  • We build dust barriers with zipper doors and run negative air, so drywall dust doesn't end up in your bedrooms.
  • Floors and walkways between the entry and the kitchen are protected for the whole job.
  • We'll set up a temporary kitchen, fridge, microwave, kettle and a working sink somewhere else in the house, before demo starts.
  • The site is swept and tools are put away at the end of every day. You get your house back each evening.
  • You get a schedule showing which trade is in the house on which days, so there are no surprise 7am knocks.
Strip kitchen, Austin, TX
Two-tone cabinetry
Strip kitchen, Austin, TX
Quartz countertops
Strip kitchen, Austin, TX
Island and seating
No cost, no obligation

Get a fixed price for your Austin kitchen

An hour at your house, then a written proposal against a defined scope. The number you sign is the number you pay.

Feature commercial, Austin, TX
No shutdown Phased around your trading hours
Commercial remodeling

Commercial Remodeling in Austin, TX

Restaurant, office and retail fit-out across Central Texas, phased around your trading hours and sequenced so that the health, fire and landlord approvals run in parallel.

Commercial work is a scheduling problem

The construction in a commercial fit-out isn't fundamentally different from residential. What's different is everything around it: you're trading while we build, there's a landlord with an opinion, a lease with a deadline, and a code path that's stricter than a house.

That's what we plan around. Night and weekend phasing where the space has to stay open. Temporary partitions that are presentable rather than just functional. A programme that hits the date on the lease, because that date has money attached to it.

Where we work

Our commercial work is interior remodeling and fit-out rather than ground-up construction:

  • Restaurants and bars, front of house, bar builds, banquettes, millwork and finishes, plus coordination with kitchen equipment suppliers.
  • Offices, reconfiguration, meeting rooms, break rooms and kitchens, reception and custom millwork.
  • Retail, shopfits, fitting rooms, display joinery and back-of-house.
  • Multi-family and HOA, unit turns, amenity spaces, clubhouse kitchens and common areas.
  • Medical and professional suites, reception, consult rooms and specialist casework.
Restaurant remodeling

Front of house, bar builds and back of house, phased around service.

Office remodeling

Reconfiguration, meeting rooms, break rooms and reception millwork.

Retail remodeling

Shopfits, fitting rooms, display joinery and back of house.

The detail

Almost every commercial project we run has a version of the same constraint. The revenue can't stop. The options, in rough order of how often they're the right answer:

  • Night and early-morning working. Standard for restaurants and retail. Noisy and dusty work happens after close, and the space is presentable before you open.
  • Zoned phasing. The space is split with proper temporary partitions and worked one zone at a time. Half the dining room, half the floor plate.
  • Short full closure. Sometimes the honest answer. A concentrated two-week shutdown often costs less in lost revenue than eight weeks of half-capacity trading. We'll model both.
  • Back of house first. Getting kitchens, storage and staff areas done while front of house keeps trading, then swapping.
Strip commercial, Austin, TX
Restaurant fit-out
Strip commercial, Austin, TX
Office reconfiguration
Strip commercial, Austin, TX
Retail shopfit
Budget

Where the money actually goes

Roughly half of a kitchen is labour, and most of the rest is cabinetry. Knowing the split is what lets you spend where it shows.

Kitchen remodeling

ProjectTypical range in AustinWhat drives it
Countertop replacement only$4,500 – $17,000Slab material, square footage, edge detail, sink cut-outs
Cabinet refacing$7,500 – $17,000Door style and finish, number of openings, hardware
Kitchen remodel, same layout$38,000 – $65,000Cabinet grade, countertop material, flooring, lighting
Kitchen remodel, layout changed$65,000 – $110,000Wall removal, beam, plumbing and electrical relocation
Luxury / custom kitchen$110,000+Custom inset cabinetry, natural stone, panel-ready appliances, millwork

Permits, disposal and the trades nobody thinks about account for more than people expect. They are in every number we give you, rather than appearing later as an extra.

Team, Austin, TX
Who does the work

Nobody here is on commission

The person who quotes your kitchen runs the job afterwards. He has no reason to promise you something the crew will have to explain away.

  • No salespeople The visit takes an hour. There is no folder and no evening presentation.
  • We will talk you down If the spend is not going to return, you will hear that from us first.
  • The quote is the price Fixed against a written scope, and it does not move unless you move it.
Get an estimate
Ready when you are

One project manager, one contract, one price

Design and construction under one roof, so there are no hand-offs to fall through.

How we work

One team, five steps, no surprises

In most cities the build is the long pole. In Austin it is the review. We plan the job backwards from the permit, which is the only way a schedule here survives contact with reality.

Site visit and feasibility 01

Site visit and feasibility

We measure, check the structure, and identify anything that will need review, trees, impervious cover, historic status.

Design and documentation 02

Design and documentation

Drawings developed to the standard the reviewer wants, because a resubmittal costs weeks, not days.

Permit and fixed price 03

Permit and fixed price

We file, and you get a line-item price and a schedule that starts from the realistic approval date.

Construction 04

Construction

One crew, one sequence, one project manager, and inspections booked ahead rather than after the fact.

Sign-off 05

Sign-off

Final inspection, joint walkthrough, punch list closed, balance due after, not before.

Questions

Frequently asked questions

Design and materials

No. Bring drawings and a cabinet list and we will price and build them. If you would rather not, layout and materials are worked out with you before you commit, and it is included.
Send us the model number before anything is ordered. Cabinetry is built around your appliances, not the other way round, and we have seen enough near misses to check twice.
Small kitchens are most of what we do. Layout beats square footage almost every time, and the moves that work are usually cheaper than the ones people assume they need.
You can, and we will fit them. What we cannot do is warrant them, and if a door arrives damaged the delay is yours rather than ours.
It changes month to month and we will give you the current figure rather than last quarter's. Nothing gets demolished until they have arrived.

Kitchen remodeling

Not with us, design and build are the same contract. That matters more than it sounds. When the designer and builder are separate companies, anything that doesn't work on site becomes an argument about whose fault it is, and you're the one refereeing. Here, if the drawing doesn't build, that's ours to solve.
Yes, and we do it regularly. Bring us the drawings and we'll price and build them. We'll also flag anything we think will cause problems on site before you commit, better to have that conversation at the drawing stage than at framing.
Yes. A large share of the kitchens we look at have solid cabinet boxes and a layout that works, and the owners are about to spend three times what they need to. If refacing and new countertops gets you where you want to be, we'll say so. We'd rather do the smaller job well and be the people you call for the bathroom next year.
Call us and we come back. Every project gets a walkthrough where we build a punch list together, and nothing is signed off until that list is closed. Workmanship issues that show up later are ours to fix; manufacturer warranties on cabinetry, stone and appliances are passed through to you in writing at handover.
A deposit to book the slot and start the design, then progress payments tied to milestones that have actually been reached, not to dates on a calendar. The final payment is due after the walkthrough punch list is closed, not before.

Commercial remodeling

Yes, and for restaurants and retail it's usually the default. We plan the noisy and dusty work for after close, and leave the space clean and presentable for opening. It costs more per hour and almost always less overall than closing.
Yes. Landlord approval is a separate track from city permitting, with its own drawings, insurance requirements and review period. We start it early because it's frequently the longer of the two.
We build the programme backwards from your date and tell you at proposal stage whether it's realistic. If it isn't, you'll hear that before you sign rather than six weeks in. The items that put dates at risk are almost always long-lead equipment and permit review, not the construction.
We coordinate with your equipment supplier and build the space to receive it, services in the right positions, the right clearances, the right ventilation. Specification and supply of the equipment itself usually sits better with a dedicated foodservice supplier, and we work alongside them.
Start your project

Book a free in-home consultation

We measure, talk through layout and materials, and follow up with a written fixed-price proposal, no obligation, no pressure, and no salesperson at your kitchen table until 10pm.

  • Bring drawings if you have them. We price and build what you want.
  • If you do not, layout and selections are worked through with you and included.
  • Appliance models captured before anything is ordered, so it fits.
  • A written proposal you can hold us to, not a mood board.

(512) 254-7557

Noir Kitchen Remodeling Austin
8868 Research Blvd, Austin, TX 78758
info@noirkitchenremodelingaustin.com
Monday to Saturday 8:00am – 7:00pm · Sunday closed

Request a free estimate

Tell us about the project and we'll come out to Austin to measure.

We reply within one business day. Your details are never sold or shared.

Call (512) 254-7557 Get an estimate